AVE - Spanish High Speed Train

In reply to the changing needs of the Civil Works market and the increase in the number of Civil Works projects in Spain, Edinger APS introduces its new range of products, renown for the company's application of new technologies and high final quality.

Edinger APS distributes a wide range of bridge deck moving joints reaching a moving range of up to 2,000 mm. Optionally, we can produce the joint with sinusoidal plates, which significantly reduces noise emissions - this is greatly appreciated if we are near urban areas.

A wide range of POT supports already implemented and awaiting operation in several sections of AVE, currently under construction.

These star products are also accompanied by a wide array of splice bar sleeves capable of resolving any unforeseen situation on-site, such as the Viaduct O Eixo (1188 m in length), which is part of the Santiago-Ourense high speed line (ZAP SCREWLOK sleeves), AVE section in Leon (ZAP SCREWLOK), AVE Barcelona Sants station section (ZAP SCREWLOK), or Abdalajis tunnel in Malaga where 18,000 BPI GRIP TWIST sleeves were used.

http://www.elcorreogallego.es/popImprimir.php?idWeb=1&idNoticia=268743



Este sitio web utiliza cookies propias para recopilar información con la finalidad de mejorar nuestros servicios. Si continua navegando, supone la aceptación de la instalación de las mismas. El usuario tiene la posibilidad de configurar su navegador pudiendo, si así lo desea, impedir que sean instaladas en su disco duro, aunque deberá tener en cuenta que dicha acción podrá ocasionar dificultades de navegación de la pagina web.

OK | Más información